TPBD-Trail Producing Before Delivery by FD
2010-04-11 22:47:27
TPBD-Trail Producing Before Delivery by FD:
- Technical performances to be fully and truly tested as per contract requirement
- Faults or defects to be found and released as possible as they can be, problems to be solved before delivery.
- Before Max percent of payment a buyer can lower purchasing risk by checking the mill in performance and quality
- Mechanical, electrical, hydraulic and pneumatic (including piping line) are in ready-made construction as per the end user requirement, site construction to be reduced or canceled accordingly
- The installation and commissioning time to be cut down in user site, the expense to be saved and the installation quality to be enhanced
- Operator and maintenance training course may be executed in advance during the trial producing period
- A real turn key delivery